Skip to content

Technology

One system, from helm to propeller

The engineering behind every ZEM package: batteries, propulsion, charging and control, designed and delivered as one system.

The ZEM system

Engineered around how the vessel works

A battery, a motor and a charger do not make a vessel electric. The system has to be engineered around the vessel's route, its load profile, and where and how fast it can charge.

ZEM designs the whole chain, from the charging connection and the battery to the switchboard, converters and propulsion motors, and runs it with one control system.

The ZEM system laid out: shore charging and the bridge console, battery racks, switchboard and converters, a transformer, and two electric motors driving propellers, connected by green power lines
The parts of one ZEM system, from the charging connection to the propellers.

01 · Batteries

Our batteries, built up from the cell

ZEM builds its battery systems brick by brick, from the cell to the system, and designs the battery space around them. From 33 kWh to as large as the vessel needs, DNV type-approved and backed by the Volvo Group.

Battery systems
CapacityFrom 33 kWh, no upper limit
ChemistryNMC, NCA and LFP
Battery systemsNMC Flatpack, NCA Volvo Cube, LFP Power and Energy packs
ApprovalMarine type-approved
Thermal managementLiquid-cooled and heated
Battery spaceDesigned by ZEM, with sensors, ventilation and fire suppression
  1. 01

    Cell

    LFP or NMC cells, chosen for the vessel's drive cycle: power for short, hard bursts, energy for long crossings.

  2. 02

    Module

    Cells in a liquid-cooled module, monitored cell by cell for voltage and temperature.

  3. 03

    String

    Modules in series up to the vessel's DC voltage, each string with its own battery management.

  4. 04

    System

    Strings in parallel on the DC bus, from a compact system to megawatt-hours, in a battery space designed by ZEM.

Approvals and certificates

Battery systems type-approved by DNV for use at sea
DNV type-approved
Part of the Volvo Group through Volvo Penta, with the strength of a large group behind every system
Backed by Volvo
Batteries taken back at end of life and recycled under the regulations
Battery return
ZEM Havlire energy storage approved by DNV or BV at sea, and CE-marked on land
DNV or BV · CE
A battery room on board: racks of liquid-cooled battery modules, cooling pipes and cabling

02 · Propulsion

Electric and hybrid propulsion

Propulsion motors and generators combined with battery, charging and auxiliary systems into one driveline. Shown here in a double-ended ferry, with a motor at each end.

Propulsion
Motors and generatorsSized to the vessel, no upper limit
OperationFully electric, or hybrid with gensets
Energy on boardBattery, shore power and gensets, managed as one
Volvo PentaFull integration of Volvo Penta components
A double-ended electric car ferry at sea, drawn see-through to show a compact battery room, control cabinet, switchboard and generator set amidships, a motor at each end, a control console on the bridge and a charging socket on deck
A compact battery room, the switchboard and control cabinet and a generator set amidships, an electric motor at each end, and the control console on the bridge. Illustration.

03 · Charging

From shore power to megawatt charging

Each vessel is tailored to the charging it will actually have at the quay.

No grid at the quay? ZEM Havlire brings the energy: mobile battery containers from 150 kWh to 1.4 MWh.

Supported charging standards
AC chargingWith onboard transformers, several cables per vessel125 A · 400 V per cable
DC fast chargingCCS2 · up to 600 kW
Megawatt chargingMCS · about 800 kW today
Megawatt charging, next3.7 MW is the top of the standardMCS · 1.2 MW, up to 3.7 MW

04 · Control and software

One control system for the driveline

Master control and power management on open industrial hardware, so it can be serviced and upgraded for the life of the vessel.

Control and software
Master controlZEM master control on a programmable PLC architecture
Power managementAcross battery, gensets and shore power
HardwareDC control systems in standard cabinets, open industrial hardware
RemoteRemote access and live data for our service engineers and ZEM Hegre
A ZEM engineer in safety glasses and insulated gloves measuring in a control cabinet on board

05 · Safety

Zero incidents since the first installation

Every battery system is type-approved for marine use, and every battery space is designed by ZEM, with sensors, ventilation and fire suppression.

Marine batteries since
2010
Helped write the first battery guidelines
DNV
First installation at sea
2015
Incidents since 2015
0

Start with the route

Tell us how the vessel works, and our engineers size the system around it.